Can someone suggest for root cause of following NCR raised by auditor during cold rolling process.
Auditor comment:-
During witnessing of the cold roll process on lathe machine MC-07 and inspection of thread after cold roll for NC 38 Pin connection box WO#2311-57 Equipment SN#12703452, observed the inspector did not perform the gauge stand off check, visual inspection by 10X mag glass on thread root, did not use profile
gauge to verify the profile after cold roll which are required per Cold Roll Inspection Report but already recorded the result by assumption and ticked “accepted” on the report.
Can someone suggest for root cause of following NCR raised by auditor during cold rolling process.
Auditor comment:-
During witnessing of the cold roll process on lathe machine MC-07 and inspection of thread after cold roll for NC 38 Pin connection box WO#2311-57 Equipment SN#12703452, observed the inspector did not perform the gauge stand off check, visual inspection by 10X mag glass on thread root, did not use profile
gauge to verify the profile after cold roll which are required per Cold Roll Inspection Report but already recorded the result by assumption and ticked “accepted” on the report.