Slide 1 of 26
Notes:
We've discussed the "7 Types of Waste" and you've begun to understand what waste looks like in the process.
The next step is to use Lead Time Analysis to find out exactly where waste exists, so that we can go about eliminating it.
Key Points:
Tool to surface where waste resides
Concept on value added & non-value added
Recognize time is money and a key competitive advantage
Lead time reduction graphic tool
Ask question how much VA in process being studied, then look back when determined (usually less than 5% VA)
Value in this being monitored by an organization and displayed in work area (a simple visual tool, don't computerize)
Method of lead-time reduction:
Reduce
Combine
Eliminate
Paper wall with flow - visual impact
The. Deming PDCA Cycle
QMS Implementation
FMEA Information
APQP Information
Auditing Information
8-D Problem Solving
Statistics
Error Proofing (Poka Yoke)
Brainstorming
Identifying Waste
Pull Systems
Lead Time Reduction
Planned Maintenance
Quick Setup
Discovering Change
Process Capability - Cp vs. Cpk
Histogram. Animation
Process Loop Animation
Taguchi Loss Function
Fishbone / Cause and Effects Animation
ADVERTISEMENT
View the Elsmar Cove
Privacy Policy
and
Terms and Conditions