Slide 23 of 161
Components, Subsystems, Main Systems
System
Design
Process
Components, Subsystems, Main Systems
Manpower, Machine, Method, Material, Measurement, Environment
Machines
Tools, Work Stations, Production Lines, Operator Training, Processes, Gauges
Focus:
Minimize failure effects on the System.
Objective/Goal:
Maximize System quality, reliability, cost and maintainability.
Focus:
Minimize failure effects on the Design.
Objective/Goal:
Maximize Design quality, reliability, cost and maintainability.
Focus:
Minimize process failures effects on the Total Process.
Objective/Goal:
Maximize Total Process quality, reliability, cost, productivity and maintainability.