Slide 25 of 26
Notes:
This is the lead time reduction graphic tool worksheet.
Use this to take all the steps and times through observation and identify the process flow:
- put a box around the description, and number the step
- make the size of the box in proportion to the time for the step
- detail time for each step
- detail distance for each step
- total the VA time
- total the NVA time
- document the combined VA & NVA total time
- calculate & document the VA% against the combined total time.
- calculate & document the NVA% against the combined total time.
The. Deming PDCA Cycle
QMS Implementation
FMEA Information
APQP Information
Auditing Information
8-D Problem Solving
Statistics
Error Proofing (Poka Yoke)
Brainstorming
Identifying Waste
Pull Systems
Lead Time Reduction
Planned Maintenance
Quick Setup
Discovering Change
Process Capability - Cp vs. Cpk
Histogram. Animation
Process Loop Animation
Taguchi Loss Function
Fishbone / Cause and Effects Animation
ADVERTISEMENT
View the Elsmar Cove
Privacy Policy
and
Terms and Conditions