.
.
Slide 33 of 200
Internal Audit System Base Requirements
Documented system
Remember 8.2.2 in ISO 9001:2000 and 4.17 in QS-9000 (now IATF 16949)
You must have a Schedule
Preferably 1.5 year minimum
Effective Corrective Element
Including An Escalation Trigger
Verification of Corrective Action
You CAN NOT close an audit out until the effectiveness of the corrective action is verified and validated!
Input of results into Management Review
This must include any specific problem areas as this is the highest level in the escalation feature of your system.
Inclusion of working environment (QS-9000 (now IATF 16949) )
ISO 19011 - Quality and Environmental Management Systems Auditing
Forum Discussions
The. Deming PDCA Cycle
QMS Implementation
FMEA Information
APQP Information
Auditing Information
8-D Problem Solving
Statistics
Error Proofing (Poka Yoke)
Brainstorming
Identifying Waste
Pull Systems
Lead Time Reduction
Planned Maintenance
Quick Setup
Discovering Change
Process Capability - Cp vs. Cpk
Histogram. Animation
Process Loop Animation
Taguchi Loss Function
Fishbone / Cause and Effects Animation
ADVERTISEMENT
View the Elsmar Cove
Privacy Policy
and
Terms and Conditions