From the APQP and Control Plan manual, and from our discussion thus far, we know that these four ‘documents’ are required. We should also by now understand that these can be looked at as ‘elements’ where each is not a discrete document.
When looking at one of these required ‘documents’ in terms of it being an element (as opposed to a discrete document) we have to look at each and determine what the specific requirements are for it. As with the control plan example on the next slide, there is a ‘minimum’ content required for each element.