Let’s look at the control plan. Three control plans are ‘required’. The first thing to remember is that the control plan evolves. This said, sometimes the control plan at the pre-launch stage may be exactly the same as that of the production stage. It depends upon the product and the processes.
The Control Plan
A Control Plan is a written description of systems for parts and processes