![]() |
![]() | ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Slide 140 of 161
Controls can be process controls such as fixture fool-proofing or SPC, or can be post-process inspection / testing.
Inspection / testing may occur at the subject operation or at subsequent operation(s) that can detect the subject failure mode.
ADVERTISEMENT
View the Elsmar Cove Privacy Policy and Terms and Conditions