The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page



First
Previous
Next
Last

Index
Home
Text

Slide 221 of 241

Preliminary Process Capability Studies

  • Characteristics identified in the control plan

  • Usually 100 pieces minimum

  • May be 30 if run is less

  • Ppk Ť 1.67 is acceptable unless otherwise specified

  • Ppk Š 1.67 requires action plan unless otherwise specified

  • Reference AIAG Fundamental SPC Reference Manual

    1.0 at spec limit

    +-3 sigma = 1.67
    Allows ‘flop’ within spec limit

    Communicating Knowledge

    APQP Forum Discussions


       

    ADVERTISEMENT

    View the Elsmar Cove Privacy Policy and Terms and Conditions